Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Aluminum Monoblock Brake Caliper Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
34 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Anodize & Ceramic Coat
1,155 < 1,600/day
Limit: downtime
Anodize & Ceramic Coat: capacity 1,155/day vs demand 1,600/day. Main limit: downtime. Raw C/T 36 s, effective C/T 44 s.
Quality (RTY)
90.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€760,320
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
582.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Brake-caliper foundry
Forged Aluminum Blanks
Daily · LT 5d
PRODUCTION CONTROL / ERP
Automotive ERP
Campaign MRP Push
CUSTOMER
Tier-1 Corner Modules
1,600 parts/d
Takt: 34 s
EDI / 2x / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
2,880
1.80 d
Drag to reorder step 1
FOUNDRY
1. Blank Shot-Blast…
×2
Push Flow
C/T
23 s
C/O
45 min
Availability
94%
Quality FPY
98.6%
Batch / EPEI
2400 / 2d
OEE
89.6%
i
Insert a step here
+
I
2,240
1.40 d
Drag to reorder step 2
MACHINING
2. Twin-Spindle Bor…
×2
Push Flow
C/T
28 s
C/O
38 min
Availability
91%
Quality FPY
97.8%
Batch / EPEI
1600 / 2d
OEE
85.2%
i
Insert a step here
+
I
3,520
2.20 d
SMED
SMED Furn…
Drag to reorder step 3
THERMAL
3. Anodize & Cerami…
×2
BOTTLENECK
C/T
36 s
C/O
65 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
2400 / 3d
OEE
76.6%
i
Insert a step here
+
I
1,760
1.10 d
Drag to reorder step 4
ASSEMBLY
4. Piston Seal & Du…
×3
FIFO Lane
C/T
26 s
C/O
15 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
800 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
1,280
0.80 d
Drag to reorder step 5
EOL TEST
5. Hydraulic Pressu…
×2
Continuous Flow
C/T
21 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
400 / 1d
OEE
90.9%
i
Insert a step at the end
+
FG
2,400
1.50 d
Finished Goods
OUT
1.80 d
VA 23 s
1.40 d
VA 28 s
2.20 d
VA 36 s
1.10 d
VA 26 s
0.80 d
VA 21 s
1.50 d
Total Lead Time
8.80 d
VA Time
2.2 min
PCE
0.03%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step