Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Copper-Free Ceramic Disc Brake Pad Press
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
50 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
300°C Scorching Plate Bake
2,981 < 4,200/day
Limit: downtime
300°C Scorching Plate Bake: capacity 2,981/day vs demand 4,200/day. Main limit: downtime. Raw C/T 14 s, effective C/T 17 s.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€698,880
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
909.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Friction Raw Compounds
Steel Backplates & Cera…
Weekly Cores · LT 6d
PRODUCTION CONTROL / ERP
Business ERP
Batch Core Lot Release
CUSTOMER
Retail Auto Chains
4,200 packs/d
Takt: 13 s
EDI / Daily PDC Truck
MRP / Weekly Cores
★ PACEMAKER
IN
Insert a step at the start
+
I
10,080
2.40 d
Drag to reorder step 1
TEARDOWN
1. Backplate Grit &…
×3
Push Flow
C/T
9.3 s
C/O
15 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
4200 / 2d
OEE
85.5%
i
Insert a step here
+
I
7,560
1.80 d
Drag to reorder step 2
WASH BAY
2. Positive Hot-Mol…
×2
Push Flow
C/T
10 s
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
4200 / 2d
OEE
87.8%
i
Insert a step here
+
I
8,820
2.10 d
KANBAN
Modular C…
Drag to reorder step 3
REMAN CELL
3. 300°C Scorching …
×4
BOTTLENECK
C/T
14 s
C/O
30 min
Availability
85%
Quality FPY
94.2%
Batch / EPEI
3360 / 1d
OEE
76.7%
i
Insert a step here
+
I
4,200
1.00 d
Drag to reorder step 4
QC BENCH
4. Chamfer Slot & N…
×2
FIFO Lane
C/T
9.5 s
C/O
12 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
1680 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
3,780
0.90 d
Drag to reorder step 5
PACK LINE
5. Shear Strength &…
×2
FIFO Lane
C/T
7.2 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
2100 / 1d
OEE
94.7%
i
Insert a step at the end
+
FG
9,240
2.20 d
Finished Goods
OUT
2.40 d
VA 9.3 s
1.80 d
VA 10 s
2.10 d
VA 14 s
1.00 d
VA 9.5 s
0.90 d
VA 7.2 s
2.20 d
Total Lead Time
10.4 d
VA Time
50 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step