Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Roll-Formed Martensitic Bumper Beam
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Zinc-Nickel Barrel Plating
1,301 < 1,800/day
Limit: downtime
Zinc-Nickel Barrel Plating: capacity 1,301/day vs demand 1,800/day. Main limit: downtime. Raw C/T 49 s, effective C/T 59 s.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€576,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
602.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Martensitic steel str…
Martensitic 1700 Steel …
2x / week · LT 6d
PRODUCTION CONTROL / ERP
Business ERP
Departmental Push MRP
CUSTOMER
Front Module Tier-1
1,800 parts/d
Takt: 45 s
EDI / 2x / day
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
4,320
2.40 d
SMED
SMED Hydr…
Drag to reorder step 1
PRESS SHOP
1. 22-Stand Roll Fo…
×2
Push Flow
C/T
31 s
C/O
75 min
Availability
88%
Quality FPY
98.5%
Batch / EPEI
3600 / 3d
OEE
84.3%
i
Insert a step here
+
I
3,240
1.80 d
Drag to reorder step 2
BODY CELL
2. In-Line Sweeping…
×1
Push Flow
C/T
38 s
C/O
35 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
1440 / 2d
OEE
84.8%
i
Insert a step here
+
I
3,420
1.90 d
Drag to reorder step 3
E-COAT
3. Laser Slot & Tow…
×2
Push Flow
C/T
41 s
C/O
40 min
Availability
91%
Quality FPY
97.9%
Batch / EPEI
1800 / 2d
OEE
86.4%
i
Insert a step here
+
I
2,880
1.60 d
BALANCING
Kanban Pu…
Drag to reorder step 4
FINAL LINE
4. Zinc-Nickel Barr…
×4
BOTTLENECK
C/T
49 s
C/O
18 min
Availability
86%
Quality FPY
95.8%
Batch / EPEI
540 / 1d
OEE
78.7%
i
Insert a step here
+
I
1,440
0.80 d
Drag to reorder step 5
QUALITY GATE
5. Pendulum Drop Im…
×2
FIFO Lane
C/T
32 s
C/O
12 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
270 / 1d
OEE
88.4%
i
Insert a step at the end
+
FG
2,700
1.50 d
Finished Goods
OUT
2.40 d
VA 31 s
1.80 d
VA 38 s
1.90 d
VA 41 s
1.60 d
VA 49 s
0.80 d
VA 32 s
1.50 d
Total Lead Time
10.0 d
VA Time
3.2 min
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step