Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
56 s
Lead Time (LT)
6.20 d
Value-Added
3.7 min
Efficiency (PCE)
0.07%
BottleneckMatched Aluminum Cold Press
670 < 960/day
Limit: downtime
Quality (RTY)
89.2%
WIP Capital
€369,024
Carbon CO₂
139.4 t CO₂e/year