Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Smart Power-Cinched Automotive Door Latch
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
21 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
90 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Robotic Grease & Rivet
2,773 < 3,800/day
Limit: downtime
Robotic Grease & Rivet: capacity 2,773/day vs demand 3,800/day. Main limit: downtime. Raw C/T 23 s, effective C/T 28 s.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€684,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,272.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
POM resin & steel sup…
Overmolded Pawl & Micro…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
Production ERP
Departmental Push MRP
CUSTOMER
Door Hardware Module …
3,800 parts/d
Takt: 21 s
EDI / 2x / day
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
9,120
2.40 d
SMED
SMED Hydr…
Drag to reorder step 1
PRESS SHOP
1. Fine-Blanking St…
×2
Push Flow
C/T
15 s
C/O
75 min
Availability
88%
Quality FPY
98.5%
Batch / EPEI
7600 / 3d
OEE
84.3%
i
Insert a step here
+
I
6,840
1.80 d
Drag to reorder step 2
BODY CELL
2. POM Acoustic Ove…
×1
Push Flow
C/T
18 s
C/O
35 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
3040 / 2d
OEE
84.8%
i
Insert a step here
+
I
7,220
1.90 d
Drag to reorder step 3
E-COAT
3. PCB Hall Switch …
×2
Push Flow
C/T
19 s
C/O
40 min
Availability
91%
Quality FPY
97.9%
Batch / EPEI
3800 / 2d
OEE
86.4%
i
Insert a step here
+
I
6,080
1.60 d
BALANCING
Kanban Pu…
Drag to reorder step 4
FINAL LINE
4. Robotic Grease &…
×4
BOTTLENECK
C/T
23 s
C/O
18 min
Availability
86%
Quality FPY
95.8%
Batch / EPEI
1140 / 1d
OEE
78.7%
i
Insert a step here
+
I
3,040
0.80 d
Drag to reorder step 5
QUALITY GATE
5. Cold -40°C Latch…
×2
FIFO Lane
C/T
15 s
C/O
12 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
570 / 1d
OEE
88.4%
i
Insert a step at the end
+
FG
5,700
1.50 d
Finished Goods
OUT
2.40 d
VA 15 s
1.80 d
VA 18 s
1.90 d
VA 19 s
1.60 d
VA 23 s
0.80 d
VA 15 s
1.50 d
Total Lead Time
10.0 d
VA Time
90 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step