Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
12m Low-Floor Electric Transit Bus Build
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.94%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Roof LFP Pack & Pantograph
7 < 12/day
Limit: changeovers
Roof LFP Pack & Pantograph: capacity 7/day vs demand 12/day. Main limit: changeovers. Raw C/T 40.1 min, effective C/T 50.2 min.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,168,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
20.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Drive & battery Tier-…
Stainless Tubular Frames
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Business ERP
Order Slot Batch Release
CUSTOMER
Municipal Transit Aut…
12 units/d
Takt: 37.5 min
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
24
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Stainless Spacef…
×3
Push Flow
C/T
26.3 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
12 / 2d
OEE
85.6%
i
Insert a step here
+
I
26
2.17 d
Drag to reorder step 2
WELD JIG
2. Composite Side S…
×4
Push Flow
C/T
31.9 min
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
12 / 2d
OEE
76.3%
i
Insert a step here
+
I
29
2.42 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. Roof LFP Pack & …
×6
BOTTLENECK
C/T
40.1 min
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
6 / 1d
OEE
65.8%
i
Insert a step here
+
I
18
1.50 d
Drag to reorder step 4
PAINT BAY
4. Floor, Seats & W…
×3
Push Flow
C/T
30.0 min
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
12 / 2d
OEE
82.5%
i
Insert a step here
+
I
11
0.92 d
Drag to reorder step 5
PDI TRACK
5. High-Voltage Tra…
×2
FIFO Lane
C/T
21.8 min
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
3 / 1d
OEE
86.5%
i
Insert a step at the end
+
I
24
2.00 d
Finished Goods
OUT
2.00 d
VA 26.3 min
2.17 d
VA 31.9 min
2.42 d
VA 40.1 min
1.50 d
VA 30.0 min
0.92 d
VA 21.8 min
2.00 d
Total Lead Time
11.3 d
VA Time
2.5 h
PCE
2.94%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step