Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Dual-Pinion Electric Power Steering
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
57 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pinion & Torque Sensor Zero
689 < 950/day
Limit: downtime
Pinion & Torque Sensor Zero: capacity 689/day vs demand 950/day. Main limit: downtime. Raw C/T 60 s, effective C/T 75 s.
Quality (RTY)
90.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,379,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
345.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Steering sensor suppl…
Rack Bars & Torque Sens…
Daily · LT 5d
PRODUCTION CONTROL / ERP
Production ERP
Campaign MRP Push
CUSTOMER
OEM Chassis Final Line
950 units/d
Takt: 57 s
EDI / 2x / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,710
1.80 d
Drag to reorder step 1
FOUNDRY
1. Rack Teeth Broac…
×2
Push Flow
C/T
39 s
C/O
45 min
Availability
94%
Quality FPY
98.6%
Batch / EPEI
1425 / 2d
OEE
89.6%
i
Insert a step here
+
I
1,330
1.40 d
Drag to reorder step 2
MACHINING
2. Induction Harden…
×2
Push Flow
C/T
48 s
C/O
38 min
Availability
91%
Quality FPY
97.8%
Batch / EPEI
950 / 2d
OEE
85.2%
i
Insert a step here
+
I
2,090
2.20 d
SMED
SMED Furn…
Drag to reorder step 3
THERMAL
3. Pinion & Torque …
×2
BOTTLENECK
C/T
60 s
C/O
65 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
1425 / 3d
OEE
76.6%
i
Insert a step here
+
I
1,045
1.10 d
Drag to reorder step 4
ASSEMBLY
4. ECU Brushless Mo…
×3
FIFO Lane
C/T
44 s
C/O
15 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
475 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
760
0.80 d
Drag to reorder step 5
EOL TEST
5. End-Stop Rack Fo…
×2
Continuous Flow
C/T
35 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
238 / 1d
OEE
90.9%
i
Insert a step at the end
+
FG
1,425
1.50 d
Finished Goods
OUT
1.80 d
VA 39 s
1.40 d
VA 48 s
2.20 d
VA 60 s
1.10 d
VA 44 s
0.80 d
VA 35 s
1.50 d
Total Lead Time
8.80 d
VA Time
3.8 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step