Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
EV Hairpin Stator & Traction Motor Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
100 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Laser Hairpin Weld & Varnish
390 < 540/day
Limit: downtime
Laser Hairpin Weld & Varnish: capacity 390/day vs demand 540/day. Main limit: downtime. Raw C/T 106 s, effective C/T 2.2 min.
Quality (RTY)
90.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,948,320
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
196.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Magnet & copper wire …
Copper Hairpins & Magne…
Daily · LT 5d
PRODUCTION CONTROL / ERP
MES
Campaign MRP Push
CUSTOMER
EV Drivetrain Integra…
540 units/d
Takt: 100 s
EDI / 2x / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
972
1.80 d
Drag to reorder step 1
FOUNDRY
1. Lamination Stack…
×2
Push Flow
C/T
68 s
C/O
45 min
Availability
94%
Quality FPY
98.6%
Batch / EPEI
810 / 2d
OEE
89.6%
i
Insert a step here
+
I
756
1.40 d
Drag to reorder step 2
MACHINING
2. Copper Hairpin F…
×2
Push Flow
C/T
84 s
C/O
38 min
Availability
91%
Quality FPY
97.8%
Batch / EPEI
540 / 2d
OEE
85.2%
i
Insert a step here
+
I
1,188
2.20 d
SMED
SMED Furn…
Drag to reorder step 3
THERMAL
3. Laser Hairpin We…
×2
BOTTLENECK
C/T
106 s
C/O
65 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
810 / 3d
OEE
76.6%
i
Insert a step here
+
I
594
1.10 d
Drag to reorder step 4
ASSEMBLY
4. Magnet Rotor Pre…
×3
FIFO Lane
C/T
78 s
C/O
15 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
270 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
432
0.80 d
Drag to reorder step 5
EOL TEST
5. Back-EMF Dyno Ve…
×2
Continuous Flow
C/T
62 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
135 / 1d
OEE
90.9%
i
Insert a step at the end
+
FG
810
1.50 d
Finished Goods
OUT
1.80 d
VA 68 s
1.40 d
VA 84 s
2.20 d
VA 106 s
1.10 d
VA 78 s
0.80 d
VA 62 s
1.50 d
Total Lead Time
8.81 d
VA Time
6.6 min
PCE
0.08%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step