Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
24-Ton Excavator Articulated Boom & Stick
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.12%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
UT Critical Joint Inspection
22 < 32/day
Limit: downtime
UT Critical Joint Inspection: capacity 22/day vs demand 32/day. Main limit: downtime. Raw C/T 30.1 min, effective C/T 37.6 min.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€915,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
54.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Wear-plate steel supp…
Heavy Plate Steel & Pins
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Order Slot Batch Release
CUSTOMER
Earthmoving OEM Final…
32 parts/d
Takt: 28.1 min
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
64
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Bevel Plasma Thi…
×3
Push Flow
C/T
19.7 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
32 / 2d
OEE
89.3%
i
Insert a step here
+
I
70
2.19 d
Drag to reorder step 2
WELD JIG
2. Dual-Robot Tande…
×4
Push Flow
C/T
23.9 min
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
32 / 2d
OEE
81.1%
i
Insert a step here
+
I
77
2.41 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. UT Critical Join…
×6
BOTTLENECK
C/T
30.1 min
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
16 / 1d
OEE
72.9%
i
Insert a step here
+
I
48
1.50 d
Drag to reorder step 4
PAINT BAY
4. Portable Line-Bo…
×3
Push Flow
C/T
22.5 min
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
32 / 2d
OEE
85.4%
i
Insert a step here
+
I
29
0.91 d
Drag to reorder step 5
PDI TRACK
5. Primer Blast & G…
×2
FIFO Lane
C/T
16.3 min
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
8 / 1d
OEE
90.7%
i
Insert a step at the end
+
I
64
2.00 d
Finished Goods
OUT
2.00 d
VA 19.7 min
2.19 d
VA 23.9 min
2.41 d
VA 30.1 min
1.50 d
VA 22.5 min
0.91 d
VA 16.3 min
2.00 d
Total Lead Time
11.1 d
VA Time
1.9 h
PCE
1.12%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step