Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
66 s
Lead Time (LT)
8.80 d
Value-Added
4.4 min
Efficiency (PCE)
0.06%
BottleneckDual-Head Seam TIG Weld
591 < 820/day
Limit: downtime
Quality (RTY)
90.1%
WIP Capital
€1,659,680
Carbon CO₂
298.3 t CO₂e/year