Municipal Aerial Ladder Fire Apparatus Body
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.80%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Centrifugal Pump Plumb
4 < 6/day
Limit: changeovers
Centrifugal Pump Plumb: capacity 4/day vs demand 6/day. Main limit: changeovers. Raw C/T 1.3 h, effective C/T 1.7 h.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,080,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Pump & aluminum extru…
Marine Al Panels & Wate…
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Business ERP
Order Slot Batch Release
CUSTOMER
City Fire Departments
6 units/d
Takt: 1.3 h
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
12
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Extruded Locker …
×3
Push Flow
C/T
52.5 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
6 / 2d
OEE
85.6%
i
Insert a step here
+
I
13
2.17 d
Drag to reorder step 2
WELD JIG
2. 3000L Poly Water…
×4
Push Flow
C/T
1.1 h
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
6 / 2d
OEE
76.3%
i
Insert a step here
+
I
14
2.33 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. Centrifugal Pump…
×6
BOTTLENECK
C/T
1.3 h
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
3 / 1d
OEE
65.8%
i
Insert a step here
+
I
9
1.50 d
Drag to reorder step 4
PAINT BAY
4. CAN-Bus Scene Li…
×3
Push Flow
C/T
1.0 h
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
6 / 2d
OEE
82.5%
i
Insert a step here
+
I
5
0.83 d
Drag to reorder step 5
PDI TRACK
5. NFPA Pump & Tilt…
×2
FIFO Lane
C/T
43.5 min
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
2 / 1d
OEE
88.6%
i
Insert a step at the end
+
I
12
2.00 d
Finished Goods
OUT
2.00 d
VA 52.5 min
2.17 d
VA 1.1 h
2.33 d
VA 1.3 h
1.50 d
VA 1.0 h
0.83 d
VA 43.5 min
2.00 d
Total Lead Time
11.5 d
VA Time
5.0 h
PCE
5.80%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step