Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
17 s
Lead Time (LT)
8.80 d
Value-Added
67 s
Efficiency (PCE)
0.01%
BottleneckPiezo Stack Pre-Load Calib
3,525 < 4,800/day
Limit: downtime
Quality (RTY)
90.1%
WIP Capital
€1,182,720
Carbon CO₂
1,746.2 t CO₂e/year