Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
ARG Aftermarket Replacement Windshield Cell
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
72 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Press-Bend Roller Furnace
531 < 750/day
Limit: downtime
Press-Bend Roller Furnace: capacity 531/day vs demand 750/day. Main limit: downtime. Raw C/T 78 s, effective C/T 97 s.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€499,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
162.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Float raw-glass suppl…
2.1mm Float & Ceramic F…
Weekly Cores · LT 6d
PRODUCTION CONTROL / ERP
Glass ERP
Batch Core Lot Release
CUSTOMER
Auto-Glass Fitting Ne…
750 parts/d
Takt: 72 s
EDI / Daily PDC Truck
MRP / Weekly Cores
★ PACEMAKER
IN
Insert a step at the start
+
I
1,800
2.40 d
Drag to reorder step 1
TEARDOWN
1. CNC Shape Cut & …
×3
Push Flow
C/T
52 s
C/O
15 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
750 / 2d
OEE
85.5%
i
Insert a step here
+
I
1,350
1.80 d
Drag to reorder step 2
WASH BAY
2. Black Frit Silks…
×2
Push Flow
C/T
56 s
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
750 / 2d
OEE
87.8%
i
Insert a step here
+
I
1,575
2.10 d
KANBAN
Modular C…
Drag to reorder step 3
REMAN CELL
3. Press-Bend Rolle…
×4
BOTTLENECK
C/T
78 s
C/O
30 min
Availability
85%
Quality FPY
94.2%
Batch / EPEI
600 / 1d
OEE
76.7%
i
Insert a step here
+
I
750
1.00 d
Drag to reorder step 4
QC BENCH
4. De-Air Bag & Aut…
×2
FIFO Lane
C/T
53 s
C/O
12 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
300 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
675
0.90 d
Drag to reorder step 5
PACK LINE
5. Optical Distorti…
×2
FIFO Lane
C/T
40 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
375 / 1d
OEE
94.7%
i
Insert a step at the end
+
FG
1,650
2.20 d
Finished Goods
OUT
2.40 d
VA 52 s
1.80 d
VA 56 s
2.10 d
VA 78 s
1.00 d
VA 53 s
0.90 d
VA 40 s
2.20 d
Total Lead Time
10.4 d
VA Time
4.7 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step