Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
HUD-Grade Acoustic Laminated Windshield
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
68 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
PVB Cleanroom Interleave
862 < 1,200/day
Limit: downtime
PVB Cleanroom Interleave: capacity 862/day vs demand 1,200/day. Main limit: downtime. Raw C/T 72 s, effective C/T 89 s.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€803,520
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
174.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Float-glass supplier
2.1mm Float & Acoustic …
Daily · LT 3d
PRODUCTION CONTROL / ERP
Glass ERP
JIS Broadcast Sequence
CUSTOMER
OEM Robot Glazing Bay
1,200 parts/d
Takt: 68 s
EDI / Hourly JIS
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,680
1.40 d
Drag to reorder step 1
MOLDING
1. Laser Diamond Sc…
×2
Push Flow
C/T
49 s
C/O
28 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
960 / 1d
OEE
88.9%
i
Insert a step here
+
I
1,800
1.50 d
Drag to reorder step 2
TRIM CELL
2. Gravity-Sag Bend…
×4
Push Flow
C/T
57 s
C/O
22 min
Availability
91%
Quality FPY
96.8%
Batch / EPEI
600 / 1d
OEE
85.2%
i
Insert a step here
+
I
1,920
1.60 d
FLOW
Single-Pi…
Drag to reorder step 3
SAFETY BAY
3. PVB Cleanroom In…
×3
BOTTLENECK
C/T
72 s
C/O
30 min
Availability
85%
Quality FPY
95.5%
Batch / EPEI
480 / 1d
OEE
76.7%
i
Insert a step here
+
I
840
0.70 d
Drag to reorder step 4
JIS LINE
4. 14-Bar Autoclave…
×3
FIFO Lane
C/T
51 s
C/O
8 min
Availability
95%
Quality FPY
98.7%
Batch / EPEI
180 / 1d
OEE
90.1%
i
FIFO
Insert a step here
+
I
480
0.40 d
Drag to reorder step 5
JIS DISPATCH
5. HUD Optical Wedg…
×2
Continuous Flow
C/T
37 s
C/O
5 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
120 / 1d
OEE
94.0%
i
Insert a step at the end
+
FG
720
0.60 d
Finished Goods
OUT
1.40 d
VA 49 s
1.50 d
VA 57 s
1.60 d
VA 72 s
0.70 d
VA 51 s
0.40 d
VA 37 s
0.60 d
Total Lead Time
6.20 d
VA Time
4.4 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step