Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Recycled PET Acoustic Modular Headliner
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
55 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Robot Edge Waterjet Trim
693 < 980/day
Limit: downtime
Robot Edge Waterjet Trim: capacity 693/day vs demand 980/day. Main limit: downtime. Raw C/T 58 s, effective C/T 71 s.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€352,408
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
142.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Glass-fiber mat suppl…
PU Core, Glass Fiber & …
Daily · LT 3d
PRODUCTION CONTROL / ERP
JIS ERP
JIS Broadcast Sequence
CUSTOMER
OEM Trim Line Window …
980 parts/d
Takt: 55 s
EDI / Hourly JIS
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,372
1.40 d
Drag to reorder step 1
MOLDING
1. PU Core Pre-Heat…
×2
Push Flow
C/T
40 s
C/O
28 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
784 / 1d
OEE
87.7%
i
Insert a step here
+
I
1,470
1.50 d
Drag to reorder step 2
TRIM CELL
2. Hot Press Cure &…
×4
Push Flow
C/T
46 s
C/O
22 min
Availability
91%
Quality FPY
96.8%
Batch / EPEI
490 / 1d
OEE
83.8%
i
Insert a step here
+
I
1,568
1.60 d
FLOW
Single-Pi…
Drag to reorder step 3
SAFETY BAY
3. Robot Edge Water…
×3
BOTTLENECK
C/T
58 s
C/O
30 min
Availability
85%
Quality FPY
95.5%
Batch / EPEI
392 / 1d
OEE
74.4%
i
Insert a step here
+
I
686
0.70 d
Drag to reorder step 4
JIS LINE
4. Grip Handle & Wi…
×3
FIFO Lane
C/T
42 s
C/O
8 min
Availability
95%
Quality FPY
98.7%
Batch / EPEI
147 / 1d
OEE
88.2%
i
FIFO
Insert a step here
+
I
392
0.40 d
Drag to reorder step 5
JIS DISPATCH
5. Clean White-Glov…
×2
Continuous Flow
C/T
30 s
C/O
5 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
98 / 1d
OEE
92.2%
i
Insert a step at the end
+
FG
588
0.60 d
Finished Goods
OUT
1.40 d
VA 40 s
1.50 d
VA 46 s
1.60 d
VA 58 s
0.70 d
VA 42 s
0.40 d
VA 30 s
0.60 d
Total Lead Time
6.20 d
VA Time
3.6 min
PCE
0.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step