Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Curved Pillar-to-Pillar Glass Display Module
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
87 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.21 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.10%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Autoclave Debubble Cure
437 < 620/day
Limit: downtime
Autoclave Debubble Cure: capacity 437/day vs demand 620/day. Main limit: downtime. Raw C/T 92 s, effective C/T 113 s.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,306,960
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
90.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cover-glass supplier
Optically Bonded OLED &…
Daily · LT 3d
PRODUCTION CONTROL / ERP
MES
JIS Broadcast Sequence
CUSTOMER
Cockpit JIS Tier-1
620 units/d
Takt: 87 s
EDI / Hourly JIS
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
868
1.40 d
Drag to reorder step 1
MOLDING
1. AR Glass Cleanro…
×2
Push Flow
C/T
63 s
C/O
28 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
496 / 1d
OEE
87.7%
i
Insert a step here
+
I
930
1.50 d
Drag to reorder step 2
TRIM CELL
2. OCA Vacuum Optic…
×4
Push Flow
C/T
73 s
C/O
22 min
Availability
91%
Quality FPY
96.8%
Batch / EPEI
310 / 1d
OEE
83.8%
i
Insert a step here
+
I
992
1.60 d
FLOW
Single-Pi…
Drag to reorder step 3
SAFETY BAY
3. Autoclave Debubb…
×3
BOTTLENECK
C/T
92 s
C/O
30 min
Availability
85%
Quality FPY
95.5%
Batch / EPEI
248 / 1d
OEE
74.4%
i
Insert a step here
+
I
434
0.70 d
Drag to reorder step 4
JIS LINE
4. Die-Cast Spine &…
×3
FIFO Lane
C/T
66 s
C/O
8 min
Availability
95%
Quality FPY
98.7%
Batch / EPEI
93 / 1d
OEE
88.2%
i
FIFO
Insert a step here
+
I
248
0.40 d
Drag to reorder step 5
JIS DISPATCH
5. Mura Uniformity …
×2
Continuous Flow
C/T
48 s
C/O
5 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
62 / 1d
OEE
92.2%
i
Insert a step at the end
+
FG
372
0.60 d
Finished Goods
OUT
1.40 d
VA 63 s
1.50 d
VA 73 s
1.60 d
VA 92 s
0.70 d
VA 66 s
0.40 d
VA 48 s
0.60 d
Total Lead Time
6.21 d
VA Time
5.7 min
PCE
0.10%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step