Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Plug-Sliding Pneumatic Metro Car Door
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
37.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.38%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Linear Screw & Drive Beam
65 < 95/day
Limit: downtime
Linear Screw & Drive Beam: capacity 65/day vs demand 95/day. Main limit: downtime. Raw C/T 10.1 min, effective C/T 12.7 min.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,725,900
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
163.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Rail door-drive motor…
Honeycomb Al Leaves & G…
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Production ERP
Order Slot Batch Release
CUSTOMER
Metro Train Builders
95 units/d
Takt: 9.5 min
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
190
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Al Extrusion CNC…
×3
Push Flow
C/T
6.6 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
95 / 2d
OEE
89.3%
i
Insert a step here
+
I
209
2.20 d
Drag to reorder step 2
WELD JIG
2. Door Leaf Epoxy …
×4
Push Flow
C/T
8.1 min
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
95 / 2d
OEE
81.1%
i
Insert a step here
+
I
228
2.40 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. Linear Screw & D…
×6
BOTTLENECK
C/T
10.1 min
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
48 / 1d
OEE
72.9%
i
Insert a step here
+
I
143
1.51 d
Drag to reorder step 4
PAINT BAY
4. Obstacle Detecti…
×3
Push Flow
C/T
7.6 min
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
95 / 2d
OEE
85.4%
i
Insert a step here
+
I
86
0.91 d
Drag to reorder step 5
PDI TRACK
5. 500-Cycle Endura…
×2
FIFO Lane
C/T
5.5 min
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
24 / 1d
OEE
90.8%
i
Insert a step at the end
+
I
190
2.00 d
Finished Goods
OUT
2.00 d
VA 6.6 min
2.20 d
VA 8.1 min
2.40 d
VA 10.1 min
1.51 d
VA 7.6 min
0.91 d
VA 5.5 min
2.00 d
Total Lead Time
11.1 d
VA Time
37.9 min
PCE
0.38%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step