5-Piece Off-The-Road Mining Haul Truck Rim
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.28%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Mag-Particle Crack Inspect
19 < 28/day
Limit: downtime
Mag-Particle Crack Inspect: capacity 19/day vs demand 28/day. Main limit: downtime. Raw C/T 34.4 min, effective C/T 43.0 min.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€739,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
48.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Heavy plate steel sup…
30mm Gutter & Bead Bases
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Order Slot Batch Release
CUSTOMER
Open-Pit Mining Fleets
28 parts/d
Takt: 32.1 min
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
56
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Roll-Bend Barrel…
×3
Push Flow
C/T
22.5 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
28 / 2d
OEE
89.3%
i
Insert a step here
+
I
62
2.21 d
Drag to reorder step 2
WELD JIG
2. Lock-Ring Gutter…
×4
Push Flow
C/T
27.3 min
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
28 / 2d
OEE
81.1%
i
Insert a step here
+
I
67
2.39 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. Mag-Particle Cra…
×6
BOTTLENECK
C/T
34.4 min
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
14 / 1d
OEE
72.9%
i
Insert a step here
+
I
42
1.50 d
Drag to reorder step 4
PAINT BAY
4. Disc-to-Rim Subm…
×3
Push Flow
C/T
25.7 min
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
28 / 2d
OEE
85.4%
i
Insert a step here
+
I
25
0.89 d
Drag to reorder step 5
PDI TRACK
5. High-Build Zinc …
×2
FIFO Lane
C/T
18.7 min
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
7 / 1d
OEE
90.7%
i
Insert a step at the end
+
I
56
2.00 d
Finished Goods
OUT
2.00 d
VA 22.5 min
2.21 d
VA 27.3 min
2.39 d
VA 34.4 min
1.50 d
VA 25.7 min
0.89 d
VA 18.7 min
2.00 d
Total Lead Time
11.1 d
VA Time
2.1 h
PCE
1.28%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step