Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
32.1 min
Lead Time (LT)
11.1 d
Value-Added
2.1 h
Efficiency (PCE)
1.28%
BottleneckMag-Particle Crack Inspect
19 < 28/day
Limit: downtime
Quality (RTY)
87.2%
WIP Capital
€739,200
Carbon CO₂
48.0 t CO₂e/year