Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
72 s
Lead Time (LT)
8.81 d
Value-Added
4.8 min
Efficiency (PCE)
0.06%
BottleneckDie-Level HV Test & Pot
544 < 750/day
Limit: downtime
Quality (RTY)
90.1%
WIP Capital
€2,112,000
Carbon CO₂
272.8 t CO₂e/year