Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Heavy-Duty Aluminum Radiator Brazing Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
93 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
CAB Flux Brazing Tunnel
410 < 580/day
Limit: downtime
CAB Flux Brazing Tunnel: capacity 410/day vs demand 580/day. Main limit: downtime. Raw C/T 101 s, effective C/T 2.1 min.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€410,176
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
125.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aluminum strip suppli…
Fin Stock & Flat Coolin…
Weekly Cores · LT 6d
PRODUCTION CONTROL / ERP
Cloud ERP
Batch Core Lot Release
CUSTOMER
Aftermarket Cooling H…
580 units/d
Takt: 93 s
EDI / Daily PDC Truck
MRP / Weekly Cores
★ PACEMAKER
IN
Insert a step at the start
+
I
1,392
2.40 d
Drag to reorder step 1
TEARDOWN
1. High-Speed Louve…
×3
Push Flow
C/T
67 s
C/O
15 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
580 / 2d
OEE
85.5%
i
Insert a step here
+
I
1,044
1.80 d
Drag to reorder step 2
WASH BAY
2. Automated Core T…
×2
Push Flow
C/T
73 s
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
580 / 2d
OEE
87.8%
i
Insert a step here
+
I
1,218
2.10 d
KANBAN
Modular C…
Drag to reorder step 3
REMAN CELL
3. CAB Flux Brazing…
×4
BOTTLENECK
C/T
101 s
C/O
30 min
Availability
85%
Quality FPY
94.2%
Batch / EPEI
464 / 1d
OEE
76.7%
i
Insert a step here
+
I
580
1.00 d
Drag to reorder step 4
QC BENCH
4. PA66 Nylon Tank …
×2
FIFO Lane
C/T
69 s
C/O
12 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
232 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
522
0.90 d
Drag to reorder step 5
PACK LINE
5. 2.5-Bar Underwat…
×2
FIFO Lane
C/T
52 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
290 / 1d
OEE
94.7%
i
Insert a step at the end
+
FG
1,276
2.20 d
Finished Goods
OUT
2.40 d
VA 67 s
1.80 d
VA 73 s
2.10 d
VA 101 s
1.00 d
VA 69 s
0.90 d
VA 52 s
2.20 d
Total Lead Time
10.4 d
VA Time
6.0 min
PCE
0.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step