Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Speed Passenger Rail Bogie Assembly
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
50.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.98%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Gantry Bore & Wheel Press
12 < 18/day
Limit: downtime
Gantry Bore & Wheel Press: capacity 12/day vs demand 18/day. Main limit: downtime. Raw C/T 53.5 min, effective C/T 1.1 h.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,881,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
30.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Wheelset forging supp…
CrMo Forged Axles & Fra…
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Rail ERP
Order Slot Batch Release
CUSTOMER
Rolling Stock Final P…
18 assemblies/d
Takt: 50.0 min
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
36
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Box-Section Sub-…
×3
Push Flow
C/T
35.0 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
18 / 2d
OEE
89.3%
i
Insert a step here
+
I
40
2.22 d
Drag to reorder step 2
WELD JIG
2. UT Weld & Stress…
×4
Push Flow
C/T
42.5 min
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
18 / 2d
OEE
81.1%
i
Insert a step here
+
I
43
2.39 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. Gantry Bore & Wh…
×6
BOTTLENECK
C/T
53.5 min
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
9 / 1d
OEE
72.9%
i
Insert a step here
+
I
27
1.50 d
Drag to reorder step 4
PAINT BAY
4. Primary Spring &…
×3
Push Flow
C/T
40.0 min
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
18 / 2d
OEE
85.4%
i
Insert a step here
+
I
16
0.89 d
Drag to reorder step 5
PDI TRACK
5. 120kN Static Loa…
×2
FIFO Lane
C/T
29.0 min
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
5 / 1d
OEE
91.1%
i
Insert a step at the end
+
I
36
2.00 d
Finished Goods
OUT
2.00 d
VA 35.0 min
2.22 d
VA 42.5 min
2.39 d
VA 53.5 min
1.50 d
VA 40.0 min
0.89 d
VA 29.0 min
2.00 d
Total Lead Time
11.2 d
VA Time
3.3 h
PCE
1.98%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step