Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
VNT Remanufactured Passenger Turbocharger
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
113 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
New Bearing & Seal Fit
340 < 480/day
Limit: downtime
New Bearing & Seal Fit: capacity 340/day vs demand 480/day. Main limit: downtime. Raw C/T 2.0 min, effective C/T 2.5 min.
Quality (RTY)
83.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€574,080
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
103.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
IAM Core Logistics
Used Turbo Shells
Weekly Cores · LT 6d
PRODUCTION CONTROL / ERP
Business ERP
Batch Core Lot Release
CUSTOMER
Regional parts wareho…
480 units/d
Takt: 113 s
EDI / Daily PDC Truck
MRP / Weekly Cores
★ PACEMAKER
IN
Insert a step at the start
+
I
1,152
2.40 d
Drag to reorder step 1
TEARDOWN
1. Turbine Hot-Side…
×3
Push Flow
C/T
81 s
C/O
15 min
Availability
94%
Quality FPY
92.5%
Batch / EPEI
480 / 2d
OEE
85.5%
i
Insert a step here
+
I
864
1.80 d
Drag to reorder step 2
WASH BAY
2. Precision Shaft …
×2
Push Flow
C/T
88 s
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
480 / 2d
OEE
87.8%
i
Insert a step here
+
I
1,008
2.10 d
KANBAN
Modular C…
Drag to reorder step 3
REMAN CELL
3. New Bearing & Se…
×4
BOTTLENECK
C/T
2.0 min
C/O
30 min
Availability
85%
Quality FPY
94.2%
Batch / EPEI
384 / 1d
OEE
76.7%
i
Insert a step here
+
I
480
1.00 d
Drag to reorder step 4
QC BENCH
4. High-Speed VSR B…
×2
FIFO Lane
C/T
83 s
C/O
12 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
192 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
432
0.90 d
Drag to reorder step 5
PACK LINE
5. Flow-Bench Actua…
×2
FIFO Lane
C/T
63 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
240 / 1d
OEE
94.7%
i
Insert a step at the end
+
FG
1,056
2.20 d
Finished Goods
OUT
2.40 d
VA 81 s
1.80 d
VA 88 s
2.10 d
VA 2.0 min
1.00 d
VA 83 s
0.90 d
VA 63 s
2.20 d
Total Lead Time
10.4 d
VA Time
7.3 min
PCE
0.08%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step