Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
CVT Continuous Agricultural Tractor Gearbox
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
55.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.56%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Planetary & Wet Clutch Stack
44 < 65/day
Limit: downtime
Planetary & Wet Clutch Stack: capacity 44/day vs demand 65/day. Main limit: downtime. Raw C/T 14.8 min, effective C/T 18.5 min.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,792,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
111.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Tractor casting found…
Nodular Iron Housings &…
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Production ERP
Order Slot Batch Release
CUSTOMER
Tractor Skid Line
65 units/d
Takt: 13.8 min
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
130
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Heavy Horizontal…
×3
Push Flow
C/T
9.7 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
65 / 2d
OEE
89.3%
i
Insert a step here
+
I
143
2.20 d
Drag to reorder step 2
WELD JIG
2. Axial Hydrostat …
×4
Push Flow
C/T
11.8 min
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
65 / 2d
OEE
81.1%
i
Insert a step here
+
I
156
2.40 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. Planetary & Wet …
×6
BOTTLENECK
C/T
14.8 min
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
33 / 1d
OEE
73.0%
i
Insert a step here
+
I
98
1.51 d
Drag to reorder step 4
PAINT BAY
4. Electro-Hydrauli…
×3
Push Flow
C/T
11.1 min
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
65 / 2d
OEE
85.4%
i
Insert a step here
+
I
59
0.91 d
Drag to reorder step 5
PDI TRACK
5. 300HP Back-to-Ba…
×2
FIFO Lane
C/T
8.0 min
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
16 / 1d
OEE
90.7%
i
Insert a step at the end
+
I
130
2.00 d
Finished Goods
OUT
2.00 d
VA 9.7 min
2.20 d
VA 11.8 min
2.40 d
VA 14.8 min
1.51 d
VA 11.1 min
0.91 d
VA 8.0 min
2.00 d
Total Lead Time
11.1 d
VA Time
55.4 min
PCE
0.56%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen