Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
40ft Curtain-Sider Semi-Trailer Frame
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
37.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.75%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Hot-Dip Zinc Galvanize
29 < 48/day
Limit: changeovers
Hot-Dip Zinc Galvanize: capacity 29/day vs demand 48/day. Main limit: changeovers. Raw C/T 10.0 min, effective C/T 12.5 min.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,062,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
82.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
I-beam steel supplier
Web-Cut Beams & Trailer…
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Business ERP
Order Slot Batch Release
CUSTOMER
Logistics Haulage Fle…
48 units/d
Takt: 9.4 min
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
96
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Automated Plasma…
×3
Push Flow
C/T
6.6 min
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
48 / 2d
OEE
85.6%
i
Insert a step here
+
I
106
2.21 d
Drag to reorder step 2
WELD JIG
2. Twin-Wire SAW We…
×4
Push Flow
C/T
8.0 min
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
48 / 2d
OEE
76.3%
i
Insert a step here
+
I
115
2.40 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. Hot-Dip Zinc Gal…
×6
BOTTLENECK
C/T
10.0 min
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
24 / 1d
OEE
65.8%
i
Insert a step here
+
I
72
1.50 d
Drag to reorder step 4
PAINT BAY
4. Air Suspension &…
×3
Push Flow
C/T
7.5 min
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
48 / 2d
OEE
82.5%
i
Insert a step here
+
I
43
0.90 d
Drag to reorder step 5
PDI TRACK
5. Curtain Roof & D…
×2
FIFO Lane
C/T
5.4 min
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
12 / 1d
OEE
86.5%
i
Insert a step at the end
+
I
96
2.00 d
Finished Goods
OUT
2.00 d
VA 6.6 min
2.21 d
VA 8.0 min
2.40 d
VA 10.0 min
1.50 d
VA 7.5 min
0.90 d
VA 5.4 min
2.00 d
Total Lead Time
11.1 d
VA Time
37.5 min
PCE
0.75%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen