Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Variable Geometry Turbocharger Cell
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
49 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
220,000 RPM Core Balance
795 < 1,100/day
Limit: downtime
220,000 RPM Core Balance: capacity 795/day vs demand 1,100/day. Main limit: downtime. Raw C/T 52 s, effective C/T 65 s.
Quality (RTY)
90.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,403,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
400.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Turbo housing foundry
Nickel-Alloy Turbine Wh…
Daily · LT 5d
PRODUCTION CONTROL / ERP
Production ERP
Campaign MRP Push
CUSTOMER
European Engine Plants
1,100 units/d
Takt: 49 s
EDI / 2x / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,980
1.80 d
Drag to reorder step 1
FOUNDRY
1. Shaft Friction W…
×2
Push Flow
C/T
33 s
C/O
45 min
Availability
94%
Quality FPY
98.6%
Batch / EPEI
1650 / 2d
OEE
89.6%
i
Insert a step here
+
I
1,540
1.40 d
Drag to reorder step 2
MACHINING
2. Compressor 5-Axi…
×2
Push Flow
C/T
41 s
C/O
38 min
Availability
91%
Quality FPY
97.8%
Batch / EPEI
1100 / 2d
OEE
85.2%
i
Insert a step here
+
I
2,420
2.20 d
SMED
SMED Furn…
Drag to reorder step 3
THERMAL
3. 220,000 RPM Core…
×2
BOTTLENECK
C/T
52 s
C/O
65 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
1650 / 3d
OEE
76.6%
i
Insert a step here
+
I
1,210
1.10 d
Drag to reorder step 4
ASSEMBLY
4. VGT Actuator Cal…
×3
FIFO Lane
C/T
38 s
C/O
15 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
550 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
880
0.80 d
Drag to reorder step 5
EOL TEST
5. Hot Gas Flow Aud…
×2
Continuous Flow
C/T
30 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
275 / 1d
OEE
90.9%
i
Insert a step at the end
+
FG
1,650
1.50 d
Finished Goods
OUT
1.80 d
VA 33 s
1.40 d
VA 41 s
2.20 d
VA 52 s
1.10 d
VA 38 s
0.80 d
VA 30 s
1.50 d
Total Lead Time
8.80 d
VA Time
3.3 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step