Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Commercial & Mortgage Loan Origination
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
15.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.72 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
53.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.35%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Credit Risk Underwriting
18 < 30/day
Limit: changeovers
Credit Risk Underwriting: capacity 18/day vs demand 30/day. Main limit: changeovers. Raw C/T 16.1 min, effective C/T 21.2 min.
Quality (RTY)
66.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€47,730
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Credit Bureaus & Nota…
Scoring & Collateral Re…
Continuous API · LT 2d
PRODUCTION CONTROL / ERP
BPM Case Queue + Core Banking
FIFO Queue with Manual Return Loops
CUSTOMER
Borrowers & Businesses
30 files/d
Takt: 15.0 min
EDI / Daily SEPA/SWIFT
MRP / Continuous API
★ PACEMAKER
IN
Insert a step at the start
+
I
54
1.80 d
Drag to reorder step 1
FRONT OFFICE
1. Document Intake …
×3
Push Flow
C/T
9.6 min
C/O
5 min
Availability
96%
Quality FPY
86.0%
Batch / EPEI
8 / 1d
OEE
79.1%
i
Insert a step here
+
I
48
1.60 d
Drag to reorder step 2
COMPLIANCE
2. KYC / AML Screen…
×2
Push Flow
C/T
11.7 min
C/O
8 min
Availability
94%
Quality FPY
91.5%
Batch / EPEI
8 / 1d
OEE
80.3%
i
Insert a step here
+
I
96
3.20 d
QUALITY
Straight-…
Drag to reorder step 3
RISK DESK
3. Credit Risk Unde…
×4
BOTTLENECK
C/T
16.1 min
C/O
12 min
Availability
86%
Quality FPY
88.0%
Batch / EPEI
6 / 1d
OEE
65.6%
i
Insert a step here
+
I
30
1.00 d
Drag to reorder step 4
LEGAL OPS
4. Contract & E-Sign
×2
FIFO Lane
C/T
9.3 min
C/O
5 min
Availability
97%
Quality FPY
96.5%
Batch / EPEI
3 / 1d
OEE
83.2%
i
FIFO
Insert a step here
+
I
15
0.50 d
Drag to reorder step 5
TREASURY
5. Loan Disbursement
×1
Continuous Flow
C/T
6.3 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
3 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
15
0.50 d
Finished Goods
OUT
1.80 d
VA 9.6 min
1.60 d
VA 11.7 min
3.20 d
VA 16.1 min
1.00 d
VA 9.3 min
0.50 d
VA 6.3 min
0.50 d
Total Lead Time
8.72 d
VA Time
53.0 min
PCE
1.35%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step