Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Antibody-Drug Conjugate (ADC) Payload Link
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.30%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cross-Flow Unreacted Toxin Wash
8 < 12/day
Limit: downtime
Cross-Flow Unreacted Toxin Wash: capacity 8/day vs demand 12/day. Main limit: downtime. Raw C/T 1.4 h, effective C/T 1.7 h.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€6,480,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
13.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
mAb Bulk & Cytotoxic …
Monoclonal IgG + MMAE T…
Weekly · LT 10d
PRODUCTION CONTROL / ERP
MES + SCADA
Single-Use Bag Batch Lot
CUSTOMER
Sterile Lyo Fill-Fini…
12 batches/d
Takt: 1.3 h
EDI / Dry Ice / Cryo
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
19
1.58 d
Drag to reorder step 1
UPSTREAM CLEAN
1. Isolator OEB-6 L…
×2
Push Flow
C/T
54.0 min
C/O
30 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
12 / 2d
OEE
90.4%
i
Insert a step here
+
I
22
1.83 d
Drag to reorder step 2
UPSTREAM FED
2. Antibody Reducti…
×2
Push Flow
C/T
1.1 h
C/O
40 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
18 / 2d
OEE
85.8%
i
Insert a step here
+
I
29
2.42 d
FLOW
Continuou…
Drag to reorder step 3
DOWNSTREAM
3. Cross-Flow Unrea…
×3
BOTTLENECK
C/T
1.4 h
C/O
60 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
12 / 2d
OEE
74.1%
i
Insert a step here
+
I
14
1.17 d
Drag to reorder step 4
PURIFICATION
4. 0.2um Sterile Bu…
×2
FIFO Lane
C/T
58.5 min
C/O
25 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
6 / 1d
OEE
86.2%
i
FIFO
Insert a step here
+
I
18
1.50 d
Drag to reorder step 5
BIO-QC
5. DAR Drug-to-Anti…
×2
FIFO Lane
C/T
49.5 min
C/O
15 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
10 / 1d
OEE
91.1%
i
Insert a step at the end
+
I
18
1.50 d
Finished Goods
OUT
1.58 d
VA 54.0 min
1.83 d
VA 1.1 h
2.42 d
VA 1.4 h
1.17 d
VA 58.5 min
1.50 d
VA 49.5 min
1.50 d
Total Lead Time
10.3 d
VA Time
5.1 h
PCE
3.30%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step