Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
22.5 min
Lead Time (LT)
10.1 d
Value-Added
1.5 h
Efficiency (PCE)
1.01%
BottleneckLiposome High-Shear Size 90nm
27 < 40/day
Limit: downtime
Quality (RTY)
86.7%
WIP Capital
€8,800,000
Carbon CO₂
45.9 t CO₂e/year