Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
10,000L Microbial E.Coli Insulin Fermentation
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.90%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Inclusion Body Refold & Cleave
32 < 45/day
Limit: downtime
Inclusion Body Refold & Cleave: capacity 32/day vs demand 45/day. Main limit: downtime. Raw C/T 32.4 min, effective C/T 40.8 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€8,569,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
51.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Industrial Yeast/E.Co…
Dextrose, Salts & Resins
Weekly · LT 10d
PRODUCTION CONTROL / ERP
MES
Single-Use Bag Batch Lot
CUSTOMER
Cartridge & Pen Fill …
45 batches/d
Takt: 30.0 min
EDI / Dry Ice / Cryo
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
72
1.60 d
Drag to reorder step 1
UPSTREAM CLEAN
1. Seed Tank & 10m³…
×2
Push Flow
C/T
21.6 min
C/O
30 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
45 / 2d
OEE
91.4%
i
Insert a step here
+
I
81
1.80 d
Drag to reorder step 2
UPSTREAM FED
2. High-Pressure Ce…
×2
Push Flow
C/T
25.8 min
C/O
40 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
68 / 2d
OEE
86.7%
i
Insert a step here
+
I
108
2.40 d
FLOW
Continuou…
Drag to reorder step 3
DOWNSTREAM
3. Inclusion Body R…
×3
BOTTLENECK
C/T
32.4 min
C/O
60 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
45 / 2d
OEE
75.9%
i
Insert a step here
+
I
54
1.20 d
Drag to reorder step 4
PURIFICATION
4. RP-HPLC Prep Pur…
×2
FIFO Lane
C/T
23.4 min
C/O
25 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
23 / 1d
OEE
87.9%
i
FIFO
Insert a step here
+
I
68
1.51 d
Drag to reorder step 5
BIO-QC
5. Lyophilized Bulk…
×2
FIFO Lane
C/T
19.8 min
C/O
15 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
36 / 1d
OEE
91.6%
i
Insert a step at the end
+
I
68
1.51 d
Finished Goods
OUT
1.60 d
VA 21.6 min
1.80 d
VA 25.8 min
2.40 d
VA 32.4 min
1.20 d
VA 23.4 min
1.51 d
VA 19.8 min
1.51 d
Total Lead Time
10.1 d
VA Time
2.1 h
PCE
0.90%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step