Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Human Plasma Immunoglobulin Cold-Ethanol Prep
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
42.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.27%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Solvent-Detergent Viral Kill
22 < 32/day
Limit: downtime
Solvent-Detergent Viral Kill: capacity 22/day vs demand 32/day. Main limit: downtime. Raw C/T 45.6 min, effective C/T 57.4 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€10,240,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
36.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Accredited Plasma Cen…
Frozen Source Human Pla…
Weekly · LT 10d
PRODUCTION CONTROL / ERP
ERP
Single-Use Bag Batch Lot
CUSTOMER
Immunology Hospital S…
32 batches/d
Takt: 42.2 min
EDI / Dry Ice / Cryo
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
51
1.59 d
Drag to reorder step 1
UPSTREAM CLEAN
1. Pool Cryoprecipi…
×2
Push Flow
C/T
30.4 min
C/O
30 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
32 / 2d
OEE
91.4%
i
Insert a step here
+
I
58
1.81 d
Drag to reorder step 2
UPSTREAM FED
2. Cohn Cold-Ethano…
×2
Push Flow
C/T
36.3 min
C/O
40 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
48 / 2d
OEE
86.7%
i
Insert a step here
+
I
77
2.41 d
FLOW
Continuou…
Drag to reorder step 3
DOWNSTREAM
3. Solvent-Detergen…
×3
BOTTLENECK
C/T
45.6 min
C/O
60 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
32 / 2d
OEE
75.9%
i
Insert a step here
+
I
38
1.19 d
Drag to reorder step 4
PURIFICATION
4. Chromatography &…
×2
FIFO Lane
C/T
32.9 min
C/O
25 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
16 / 1d
OEE
87.9%
i
FIFO
Insert a step here
+
I
48
1.50 d
Drag to reorder step 5
BIO-QC
5. IgG Potency & En…
×2
FIFO Lane
C/T
27.9 min
C/O
15 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
26 / 1d
OEE
91.6%
i
Insert a step at the end
+
I
48
1.50 d
Finished Goods
OUT
1.59 d
VA 30.4 min
1.81 d
VA 36.3 min
2.41 d
VA 45.6 min
1.19 d
VA 32.9 min
1.50 d
VA 27.9 min
1.50 d
Total Lead Time
10.1 d
VA Time
2.9 h
PCE
1.27%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step