Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
36.0 min
Lead Time (LT)
10.2 d
Value-Added
2.5 h
Efficiency (PCE)
1.61%
BottleneckHIC & AEC Endotoxin Removal
17 < 25/day
Limit: downtime
Quality (RTY)
86.7%
WIP Capital
€4,141,500
Carbon CO₂
28.7 t CO₂e/year