Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
113 s
Lead Time (LT)
10.0 d
Value-Added
7.7 min
Efficiency (PCE)
0.09%
BottleneckFilter Integrity Pressure Test
328 < 480/day
Limit: downtime
Quality (RTY)
86.7%
WIP Capital
€1,392,000
Carbon CO₂
551.2 t CO₂e/year