Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Metallic Waterborne OEM Automotive Basecoat
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.11 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.10%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
2um Bag & Cartridge Polish
304 < 420/day
Limit: downtime
2um Bag & Cartridge Polish: capacity 304/day vs demand 420/day. Main limit: downtime. Raw C/T 2.3 min, effective C/T 2.9 min.
Quality (RTY)
88.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,598,960
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
83.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aluminum Effect Flake…
PU Dispersion & Mica Pe…
Weekly · LT 6d
PRODUCTION CONTROL / ERP
PaintMES
Light-to-Dark Color Wheel
CUSTOMER
OEM Body Paint Circul…
420 batches/d
Takt: 2.1 min
EDI / Daily ADR
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
630
1.50 d
Drag to reorder step 1
PRE-MIX
1. Pearlescent Gent…
×2
Push Flow
C/T
87 s
C/O
25 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
630 / 2d
OEE
90.9%
i
Insert a step here
+
I
798
1.90 d
Drag to reorder step 2
REACTOR DECK
2. Multi-Angle Spec…
×2
Push Flow
C/T
108 s
C/O
65 min
Availability
89%
Quality FPY
97.2%
Batch / EPEI
630 / 3d
OEE
82.3%
i
Insert a step here
+
I
924
2.20 d
QUALITY
Inline Vi…
Drag to reorder step 3
QC LAB
3. 2um Bag & Cartri…
×2
BOTTLENECK
C/T
2.3 min
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
420 / 1d
OEE
77.6%
i
Insert a step here
+
I
378
0.90 d
Drag to reorder step 4
FILTER SKID
4. Stainless Return…
×1
FIFO Lane
C/T
93 s
C/O
15 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
210 / 1d
OEE
89.8%
i
FIFO
Insert a step here
+
I
420
1.00 d
Drag to reorder step 5
FILL LINE
5. Atomizer Spray P…
×2
FIFO Lane
C/T
77 s
C/O
25 min
Availability
93%
Quality FPY
99.1%
Batch / EPEI
210 / 1d
OEE
87.0%
i
Insert a step at the end
+
I
672
1.60 d
Finished Goods
OUT
1.50 d
VA 87 s
1.90 d
VA 108 s
2.20 d
VA 2.3 min
0.90 d
VA 93 s
1.00 d
VA 77 s
1.60 d
Total Lead Time
9.11 d
VA Time
8.4 min
PCE
0.10%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step