Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
5.8 s
Lead Time (LT)
9.80 d
Value-Added
23 s
Efficiency (PCE)
0.00%
BottleneckSpray Dry / Flowable Stabilize
10,409 < 14,000/day
Limit: downtime
Quality (RTY)
90.2%
WIP Capital
€795,760
Carbon CO₂
9,424.8 t CO₂e/year