Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
20.0 min
Lead Time (LT)
8.91 d
Value-Added
1.3 h
Efficiency (PCE)
0.96%
BottleneckDual-Lip Air Ring Blown Film
32 < 45/day
Limit: downtime
Quality (RTY)
91.5%
WIP Capital
€1,032,200
Carbon CO₂
3.8 t CO₂e/year