Home-Compostable PBAT/PLA Mulch & Bag Film
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
20.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.91 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.96%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Dual-Lip Air Ring Blown Film
32 < 45/day
Limit: downtime
Dual-Lip Air Ring Blown Film: capacity 32/day vs demand 45/day. Main limit: downtime. Raw C/T 21.4 min, effective C/T 27.0 min.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,032,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Bio-Compound Producer
Starch-PBAT Bio Compoun…
1x / week · LT 5d
PRODUCTION CONTROL / ERP
BioPoly ERP
Large Campaign Mold Schedule
CUSTOMER
Supermarket Produce &…
45 tonnes/d
Takt: 20.0 min
EDI / Daily Truck
MRP / 1x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
72
1.60 d
Drag to reorder step 1
PREP ZONE
1. Low-Shear Moistu…
×1
Continuous Flow
C/T
12.8 min
C/O
20 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
68 / 2d
OEE
94.0%
i
Insert a step here
+
I
99
2.20 d
SMED
SMED Quic…
Drag to reorder step 2
MOLDING HALL
2. Dual-Lip Air Rin…
×2
BOTTLENECK
C/T
21.4 min
C/O
95 min
Availability
82%
Quality FPY
96.5%
Batch / EPEI
90 / 4d
OEE
75.0%
i
Insert a step here
+
I
63
1.40 d
Drag to reorder step 3
QUALITY BAY
3. Corona Treat & W…
×2
Push Flow
C/T
14.4 min
C/O
15 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
23 / 1d
OEE
87.7%
i
Insert a step here
+
I
54
1.20 d
Drag to reorder step 4
ASSEMBLY
4. Star-Seal Perfor…
×3
Push Flow
C/T
16.8 min
C/O
20 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
23 / 1d
OEE
85.5%
i
Insert a step here
+
I
41
0.91 d
Drag to reorder step 5
DISPATCH
5. Micro-Tensile & …
×1
FIFO Lane
C/T
11.6 min
C/O
10 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
18 / 1d
OEE
93.9%
i
Insert a step at the end
+
I
68
1.51 d
Finished Goods
OUT
1.60 d
VA 12.8 min
2.20 d
VA 21.4 min
1.40 d
VA 14.4 min
1.20 d
VA 16.8 min
0.91 d
VA 11.6 min
1.51 d
Total Lead Time
8.91 d
VA Time
1.3 h
PCE
0.96%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step