Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
8.7m Biaxially Oriented BOPP Packaging Film
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.83 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
37.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.31%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
MDO Longitudinal Stretch
100 < 140/day
Limit: downtime
MDO Longitudinal Stretch: capacity 100/day vs demand 140/day. Main limit: downtime. Raw C/T 10.3 min, effective C/T 13.0 min.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,279,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
PP Homopolymer Produc…
PP Film Chips & Al Wire
1x / week · LT 5d
PRODUCTION CONTROL / ERP
FilmMES
Large Campaign Mold Schedule
CUSTOMER
Snack & Flexible Conv…
140 tonnes/d
Takt: 9.6 min
EDI / Daily Truck
MRP / 1x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
224
1.60 d
Drag to reorder step 1
PREP ZONE
1. Cast Sheet Chill…
×1
Continuous Flow
C/T
6.2 min
C/O
20 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
210 / 2d
OEE
94.5%
i
Insert a step here
+
I
308
2.20 d
SMED
SMED Quic…
Drag to reorder step 2
MOLDING HALL
2. MDO Longitudinal…
×2
BOTTLENECK
C/T
10.3 min
C/O
95 min
Availability
82%
Quality FPY
96.5%
Batch / EPEI
280 / 4d
OEE
76.3%
i
Insert a step here
+
I
196
1.40 d
Drag to reorder step 3
QUALITY BAY
3. TDO Stenter Tran…
×2
Push Flow
C/T
7.0 min
C/O
15 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
70 / 1d
OEE
88.7%
i
Insert a step here
+
I
168
1.20 d
Drag to reorder step 4
ASSEMBLY
4. Vacuum Aluminum …
×3
Push Flow
C/T
8.1 min
C/O
20 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
70 / 1d
OEE
86.7%
i
Insert a step here
+
I
126
0.90 d
Drag to reorder step 5
DISPATCH
5. High-Speed Slitt…
×1
FIFO Lane
C/T
5.6 min
C/O
10 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
56 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
210
1.50 d
Finished Goods
OUT
1.60 d
VA 6.2 min
2.20 d
VA 10.3 min
1.40 d
VA 7.0 min
1.20 d
VA 8.1 min
0.90 d
VA 5.6 min
1.50 d
Total Lead Time
8.83 d
VA Time
37.1 min
PCE
0.31%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step