Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
1450°C Smelted Porcelain Tile Frit & Glaze
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
14.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.16 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
55.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.45%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Water Quench Granulate Frit
69 < 95/day
Limit: downtime
Water Quench Granulate Frit: capacity 69/day vs demand 95/day. Main limit: downtime. Raw C/T 15.2 min, effective C/T 19.1 min.
Quality (RTY)
88.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€623,520
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
18.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Quartz, Zircon & Bora…
Silicate Oxides & Cobalt
Weekly · LT 6d
PRODUCTION CONTROL / ERP
CeramicERP
Light-to-Dark Color Wheel
CUSTOMER
Ceramic Tile Factories
95 tonnes/d
Takt: 14.2 min
EDI / Daily ADR
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
143
1.51 d
Drag to reorder step 1
PRE-MIX
1. Raw Oxide Dry Pr…
×2
Push Flow
C/T
9.7 min
C/O
25 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
143 / 2d
OEE
91.5%
i
Insert a step here
+
I
181
1.91 d
Drag to reorder step 2
REACTOR DECK
2. Rotary Continuou…
×2
Push Flow
C/T
11.9 min
C/O
65 min
Availability
89%
Quality FPY
97.2%
Batch / EPEI
143 / 3d
OEE
83.7%
i
Insert a step here
+
I
209
2.20 d
QUALITY
Inline Vi…
Drag to reorder step 3
QC LAB
3. Water Quench Gra…
×2
BOTTLENECK
C/T
15.2 min
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
95 / 1d
OEE
78.2%
i
Insert a step here
+
I
86
0.91 d
Drag to reorder step 4
FILTER SKID
4. Alumina Ball-Mil…
×1
FIFO Lane
C/T
10.2 min
C/O
15 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
48 / 1d
OEE
90.8%
i
FIFO
Insert a step here
+
I
95
1.00 d
Drag to reorder step 5
FILL LINE
5. Sub-Micron Ceram…
×2
FIFO Lane
C/T
8.5 min
C/O
25 min
Availability
93%
Quality FPY
99.1%
Batch / EPEI
48 / 1d
OEE
88.8%
i
Insert a step at the end
+
I
152
1.60 d
Finished Goods
OUT
1.51 d
VA 9.7 min
1.91 d
VA 11.9 min
2.20 d
VA 15.2 min
0.91 d
VA 10.2 min
1.00 d
VA 8.5 min
1.60 d
Total Lead Time
9.16 d
VA Time
55.6 min
PCE
0.45%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step