Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Steel-Cord ST-4500 Heavy Mining Conveyor Belt
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.30%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
20m Hydraulic Step-Cure Press
13 < 18/day
Limit: downtime
20m Hydraulic Step-Cure Press: capacity 13/day vs demand 18/day. Main limit: downtime. Raw C/T 1.4 h, effective C/T 1.7 h.
Quality (RTY)
89.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,068,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
8.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Brass Steel Cord Supp…
Natural Rubber & Steel …
2x / week · LT 6d
PRODUCTION CONTROL / ERP
Process ERP
Curing Cavity Batch Push
CUSTOMER
Open-Pit Copper & Coa…
18 batches/d
Takt: 1.3 h
EDI / Daily Mega-Trailer
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
32
1.78 d
Drag to reorder step 1
MIX ROOM
1. 120-Cord Tension…
×2
Push Flow
C/T
52.5 min
C/O
35 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
27 / 2d
OEE
90.9%
i
Insert a step here
+
I
29
1.61 d
Drag to reorder step 2
COMPONENT BAY
2. Top/Bottom Skim …
×2
Push Flow
C/T
1.1 h
C/O
30 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
14 / 2d
OEE
86.3%
i
Insert a step here
+
I
38
2.11 d
GREEN
Nitrogen …
Drag to reorder step 3
CURING HALL
3. 20m Hydraulic St…
×3
BOTTLENECK
C/T
1.4 h
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
18 / 2d
OEE
78.1%
i
Insert a step here
+
I
20
1.11 d
Drag to reorder step 4
FINAL FINISH
4. Edge Trim & Spli…
×2
FIFO Lane
C/T
57.0 min
C/O
15 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
7 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
16
0.89 d
Drag to reorder step 5
TIRE DC
5. DIN-K Fire & Adh…
×2
Continuous Flow
C/T
42.0 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
5 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
32
1.78 d
Finished Goods
OUT
1.78 d
VA 52.5 min
1.61 d
VA 1.1 h
2.11 d
VA 1.4 h
1.11 d
VA 57.0 min
0.89 d
VA 42.0 min
1.78 d
Total Lead Time
9.50 d
VA Time
4.9 h
PCE
2.30%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step