Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Lead-Free Titanium Crystal Stemware Blowing
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Laser Rim Crack-Off & Fire Polish
12,990 < 18,000/day
Limit: downtime
Laser Rim Crack-Off & Fire Polish: capacity 12,990/day vs demand 18,000/day. Main limit: downtime. Raw C/T 4.8 s, effective C/T 6.0 s.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€483,840
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
40,629.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Potassium Silicate Qu…
Erbium/Ti Ultra-Clear B…
Daily Silo/Sand · LT 4d
PRODUCTION CONTROL / ERP
GlassERP
Continuous Furnace Campaign
CUSTOMER
HORECA & Retail Dining
18,000 units/d
Takt: 4.5 s
EDI / Flatbed Stillage
MRP / Daily Silo/Sand
★ PACEMAKER
IN
Insert a step at the start
+
I
28,800
1.60 d
Drag to reorder step 1
BATCH TOWER
1. 1520°C Electric …
×1
Continuous Flow
C/T
3.1 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
27000 / 2d
OEE
94.2%
i
Insert a step here
+
I
25,200
1.40 d
Drag to reorder step 2
HOT END
2. Blow-and-Pull St…
×2
Continuous Flow
C/T
3.9 s
C/O
40 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
27000 / 3d
OEE
90.9%
i
Insert a step here
+
I
39,600
2.20 d
GREEN
Laser Fla…
Drag to reorder step 3
THERMAL LINE
3. Laser Rim Crack-…
×3
BOTTLENECK
C/T
4.8 s
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
18000 / 2d
OEE
77.0%
i
Insert a step here
+
I
23,400
1.30 d
Drag to reorder step 4
COLD END
4. Annealing Stress…
×2
FIFO Lane
C/T
3.5 s
C/O
20 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
10800 / 1d
OEE
87.8%
i
FIFO
Insert a step here
+
I
19,800
1.10 d
Drag to reorder step 5
STILLAGE DOCK
5. 6-Pack Display B…
×2
FIFO Lane
C/T
2.7 s
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
9000 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
36,000
2.00 d
Finished Goods
OUT
1.60 d
VA 3.1 s
1.40 d
VA 3.9 s
2.20 d
VA 4.8 s
1.30 d
VA 3.5 s
1.10 d
VA 2.7 s
2.00 d
Total Lead Time
9.60 d
VA Time
18 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step