Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hydro-Elastic Aluminum/Rubber Engine Mount
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
23 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.30 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
89 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vacuum Glycol Fill & Swage
1,709 < 2,400/day
Limit: downtime
Vacuum Glycol Fill & Swage: capacity 1,709/day vs demand 2,400/day. Main limit: downtime. Raw C/T 24 s, effective C/T 30 s.
Quality (RTY)
89.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€491,040
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,165.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Al Die-Cast & Natural…
Phosphated Steel & Glyc…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
Automotive ERP
Curing Cavity Batch Push
CUSTOMER
Automotive Subframe A…
2,400 units/d
Takt: 23 s
EDI / Daily Mega-Trailer
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
4,320
1.80 d
Drag to reorder step 1
MIX ROOM
1. Shot-Blast & Adh…
×2
Push Flow
C/T
16 s
C/O
35 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
3600 / 2d
OEE
90.1%
i
Insert a step here
+
I
3,840
1.60 d
Drag to reorder step 2
COMPONENT BAY
2. Transfer Injecti…
×2
Push Flow
C/T
19 s
C/O
30 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
1920 / 2d
OEE
85.1%
i
Insert a step here
+
I
5,040
2.10 d
GREEN
Nitrogen …
Drag to reorder step 3
CURING HALL
3. Vacuum Glycol Fi…
×3
BOTTLENECK
C/T
24 s
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
2400 / 2d
OEE
76.9%
i
Insert a step here
+
I
2,640
1.10 d
Drag to reorder step 4
FINAL FINISH
4. 100% Dynamic Sti…
×2
FIFO Lane
C/T
17 s
C/O
15 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
960 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
2,160
0.90 d
Drag to reorder step 5
TIRE DC
5. 3-Axis Fatigue A…
×2
Continuous Flow
C/T
13 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
720 / 1d
OEE
93.6%
i
Insert a step at the end
+
I
4,320
1.80 d
Finished Goods
OUT
1.80 d
VA 16 s
1.60 d
VA 19 s
2.10 d
VA 24 s
1.10 d
VA 17 s
0.90 d
VA 13 s
1.80 d
Total Lead Time
9.30 d
VA Time
89 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step