Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Micro-Wave Co-Extruded EPDM Car Door Weatherstrip
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
8.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.30 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
34 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Waterborne Flock Adhesive Spray
6,875 < 9,500/day
Limit: downtime
Waterborne Flock Adhesive Spray: capacity 6,875/day vs demand 9,500/day. Main limit: downtime. Raw C/T 9.2 s, effective C/T 11 s.
Quality (RTY)
89.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€742,140
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4,614.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
EPDM & Metal Carrier …
Sponge/Dense EPDM & Ste…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
Automotive ERP
Curing Cavity Batch Push
CUSTOMER
Automotive Door Tier-1
9,500 parts/d
Takt: 8.5 s
EDI / Daily Mega-Trailer
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
17,100
1.80 d
Drag to reorder step 1
MIX ROOM
1. Quad-Die Steel C…
×2
Push Flow
C/T
6.0 s
C/O
35 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
14250 / 2d
OEE
90.9%
i
Insert a step here
+
I
15,200
1.60 d
Drag to reorder step 2
COMPONENT BAY
2. UHF Microwave + …
×2
Push Flow
C/T
7.2 s
C/O
30 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
7600 / 2d
OEE
86.3%
i
Insert a step here
+
I
19,950
2.10 d
GREEN
Nitrogen …
Drag to reorder step 3
CURING HALL
3. Waterborne Flock…
×3
BOTTLENECK
C/T
9.2 s
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
9500 / 2d
OEE
78.1%
i
Insert a step here
+
I
10,450
1.10 d
Drag to reorder step 4
FINAL FINISH
4. Corner Molded In…
×2
FIFO Lane
C/T
6.5 s
C/O
15 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
3800 / 1d
OEE
88.6%
i
FIFO
Insert a step here
+
I
8,550
0.90 d
Drag to reorder step 5
TIRE DC
5. Cut-to-Length Ca…
×2
Continuous Flow
C/T
4.8 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
2850 / 1d
OEE
94.5%
i
Insert a step at the end
+
I
17,100
1.80 d
Finished Goods
OUT
1.80 d
VA 6.0 s
1.60 d
VA 7.2 s
2.10 d
VA 9.2 s
1.10 d
VA 6.5 s
0.90 d
VA 4.8 s
1.80 d
Total Lead Time
9.30 d
VA Time
34 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step