Graphite-Enhanced EPS Thermal Insulation Block
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
116 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
24h Pentane Aging Silos
1,261 < 1,800/day
Limit: downtime
24h Pentane Aging Silos: capacity 1,261/day vs demand 1,800/day. Main limit: downtime. Raw C/T 32 s, effective C/T 41 s.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€145,728
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
153.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Regional EPS Bead Pro…
Pentane Expandable PS B…
1x / week · LT 5d
PRODUCTION CONTROL / ERP
Process ERP
Large Campaign Mold Schedule
CUSTOMER
ETICS Facade Builders
1,800 parts/d
Takt: 30 s
EDI / Daily Truck
MRP / 1x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
2,880
1.60 d
Drag to reorder step 1
PREP ZONE
1. Steam Pre-Expans…
×1
Continuous Flow
C/T
19 s
C/O
20 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
2700 / 2d
OEE
94.0%
i
Insert a step here
+
I
3,960
2.20 d
SMED
SMED Quic…
Drag to reorder step 2
MOLDING HALL
2. 24h Pentane Agin…
×2
BOTTLENECK
C/T
32 s
C/O
95 min
Availability
82%
Quality FPY
96.5%
Batch / EPEI
3600 / 4d
OEE
75.0%
i
Insert a step here
+
I
2,520
1.40 d
Drag to reorder step 3
QUALITY BAY
3. Vacuum Block Mol…
×2
Push Flow
C/T
22 s
C/O
15 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
900 / 1d
OEE
87.7%
i
Insert a step here
+
I
2,160
1.20 d
Drag to reorder step 4
ASSEMBLY
4. CNC Oscillating …
×3
Push Flow
C/T
25 s
C/O
20 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
900 / 1d
OEE
85.4%
i
Insert a step here
+
I
1,620
0.90 d
Drag to reorder step 5
DISPATCH
5. Shrink Wrap & La…
×1
FIFO Lane
C/T
17 s
C/O
10 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
720 / 1d
OEE
93.9%
i
Insert a step at the end
+
I
2,700
1.50 d
Finished Goods
OUT
1.60 d
VA 19 s
2.20 d
VA 32 s
1.40 d
VA 22 s
1.20 d
VA 25 s
0.90 d
VA 17 s
1.50 d
Total Lead Time
8.80 d
VA Time
116 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step