Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
IS 10-Section Amber Beer/Pharma Glass Container
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
0.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.0 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Tin Hot-End & Annealing Lehr
51,960 < 180,000/day
Limit: downtime
Tin Hot-End & Annealing Lehr: capacity 51,960/day vs demand 180,000/day. Main limit: downtime. Raw C/T 1.2 s, effective C/T 1.5 s.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€207,360
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
406,296.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
75% Post-Consumer Amb…
Recycled Amber Cullet &…
Daily Silo/Sand · LT 4d
PRODUCTION CONTROL / ERP
GlassMES
Continuous Furnace Campaign
CUSTOMER
Breweries & Food Jars
180,000 units/d
Takt: 0.5 s
EDI / Flatbed Stillage
MRP / Daily Silo/Sand
★ PACEMAKER
IN
Insert a step at the start
+
I
288,000
1.60 d
Drag to reorder step 1
BATCH TOWER
1. Gob Weight Servo…
×1
Continuous Flow
C/T
1.2 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
270000 / 2d
OEE
94.2%
i
Insert a step here
+
I
252,000
1.40 d
Drag to reorder step 2
HOT END
2. 10-Section NNPB …
×2
Continuous Flow
C/T
1.2 s
C/O
40 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
270000 / 3d
OEE
90.9%
i
Insert a step here
+
I
396,000
2.20 d
GREEN
Laser Fla…
Drag to reorder step 3
THERMAL LINE
3. Tin Hot-End & An…
×3
BOTTLENECK
C/T
1.2 s
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
180000 / 2d
OEE
77.0%
i
Insert a step here
+
I
234,000
1.30 d
Drag to reorder step 4
COLD END
4. Multi-Camera Vis…
×2
FIFO Lane
C/T
1.2 s
C/O
20 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
108000 / 1d
OEE
87.8%
i
FIFO
Insert a step here
+
I
198,000
1.10 d
Drag to reorder step 5
STILLAGE DOCK
5. Auto Tier Pad Bu…
×2
FIFO Lane
C/T
1.2 s
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
90000 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
360,000
2.00 d
Finished Goods
OUT
1.60 d
VA 1.2 s
1.40 d
VA 1.2 s
2.20 d
VA 1.2 s
1.30 d
VA 1.2 s
1.10 d
VA 1.2 s
2.00 d
Total Lead Time
9.60 d
VA Time
6.0 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step