Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
12.3 min
Lead Time (LT)
9.64 d
Value-Added
49.0 min
Efficiency (PCE)
0.38%
BottleneckFormaldehyde-Free Resin Cure
79 < 110/day
Limit: downtime
Quality (RTY)
89.0%
WIP Capital
€929,280
Carbon CO₂
248.3 t CO₂e/year