Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
20L UN-Certified HDPE Chemical Jerrycan
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
23 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
87 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Continuous Accumulator Blow
2,566 < 3,600/day
Limit: downtime
Continuous Accumulator Blow: capacity 2,566/day vs demand 3,600/day. Main limit: downtime. Raw C/T 24 s, effective C/T 30 s.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€133,056
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
307.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Regional High-MW HDPE…
BM-Grade HDPE & Carbon …
1x / week · LT 5d
PRODUCTION CONTROL / ERP
Planning ERP
Large Campaign Mold Schedule
CUSTOMER
Chemical & Ag Formula…
3,600 units/d
Takt: 23 s
EDI / Daily Truck
MRP / 1x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
5,760
1.60 d
Drag to reorder step 1
PREP ZONE
1. Silo Blender Mas…
×1
Continuous Flow
C/T
14 s
C/O
20 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
5400 / 2d
OEE
94.5%
i
Insert a step here
+
I
7,920
2.20 d
SMED
SMED Quic…
Drag to reorder step 2
MOLDING HALL
2. Continuous Accum…
×2
BOTTLENECK
C/T
24 s
C/O
95 min
Availability
82%
Quality FPY
96.5%
Batch / EPEI
7200 / 4d
OEE
76.3%
i
Insert a step here
+
I
5,040
1.40 d
Drag to reorder step 3
QUALITY BAY
3. Auto Deflash & N…
×2
Push Flow
C/T
16 s
C/O
15 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
1800 / 1d
OEE
88.7%
i
Insert a step here
+
I
4,320
1.20 d
Drag to reorder step 4
ASSEMBLY
4. 100% Air-Decay L…
×3
Push Flow
C/T
19 s
C/O
20 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
1800 / 1d
OEE
86.7%
i
Insert a step here
+
I
3,240
0.90 d
Drag to reorder step 5
DISPATCH
5. Robotic Bag & Pa…
×1
FIFO Lane
C/T
13 s
C/O
10 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
1440 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
5,400
1.50 d
Finished Goods
OUT
1.60 d
VA 14 s
2.20 d
VA 24 s
1.40 d
VA 16 s
1.20 d
VA 19 s
0.90 d
VA 13 s
1.50 d
Total Lead Time
8.80 d
VA Time
87 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step