Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
23 s
Lead Time (LT)
8.80 d
Value-Added
87 s
Efficiency (PCE)
0.01%
BottleneckContinuous Accumulator Blow
2,566 < 3,600/day
Limit: downtime
Quality (RTY)
91.5%
WIP Capital
€133,056
Carbon CO₂
307.0 t CO₂e/year