Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Metallocene EVA/PO Hot-Melt Packaging Pellets
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.59 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Underwater Strand Pelletizer
32 < 42/day
Limit: downtime
Underwater Strand Pelletizer: capacity 32/day vs demand 42/day. Main limit: downtime. Raw C/T 34.1 min, effective C/T 41.8 min.
Quality (RTY)
91.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€749,700
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
6.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Metallocene Polyolefi…
Polyolefin Resins & Wax…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Process ERP
Kettle Recipe Campaign
CUSTOMER
Beverage & Carton Pac…
42 tonnes/d
Takt: 32.1 min
EDI / Daily ADR / Van
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
59
1.40 d
Drag to reorder step 1
TANK FARM
1. Nitrogen-Blanket…
×1
Continuous Flow
C/T
20.6 min
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
63 / 2d
OEE
93.2%
i
Insert a step here
+
I
67
1.60 d
Drag to reorder step 2
BLEND BAY
2. Lab Ring-Ball So…
×2
Push Flow
C/T
27.0 min
C/O
45 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
50 / 2d
OEE
86.9%
i
Insert a step here
+
I
84
2.00 d
AUTOMATION
In-Line B…
Drag to reorder step 3
CHEM QC LAB
3. Underwater Stran…
×2
BOTTLENECK
C/T
34.1 min
C/O
18 min
Availability
85%
Quality FPY
95.8%
Batch / EPEI
42 / 1d
OEE
80.3%
i
Insert a step here
+
I
46
1.10 d
Drag to reorder step 4
PACK LINE
4. Fluidized Cooler…
×2
FIFO Lane
C/T
25.1 min
C/O
30 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
25 / 1d
OEE
87.1%
i
FIFO
Insert a step here
+
I
38
0.90 d
Drag to reorder step 5
ADR DOCK
5. 20kg Kraft Bag &…
×2
Continuous Flow
C/T
18.0 min
C/O
10 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
17 / 1d
OEE
94.7%
i
Insert a step at the end
+
I
63
1.50 d
Finished Goods
OUT
1.40 d
VA 20.6 min
1.60 d
VA 27.0 min
2.00 d
VA 34.1 min
1.10 d
VA 25.1 min
0.90 d
VA 18.0 min
1.50 d
Total Lead Time
8.59 d
VA Time
2.1 h
PCE
1.08%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step