Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
32.1 min
Lead Time (LT)
9.96 d
Value-Added
2.1 h
Efficiency (PCE)
1.39%
BottleneckDrum Flaker Thin Film Dry
20 < 28/day
Limit: downtime
Quality (RTY)
90.2%
WIP Capital
€536,250
Carbon CO₂
18.8 t CO₂e/year