Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Leonardite Potassium Humate Flake Extraction
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.96 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.39%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Drum Flaker Thin Film Dry
20 < 28/day
Limit: downtime
Drum Flaker Thin Film Dry: capacity 20/day vs demand 28/day. Main limit: downtime. Raw C/T 34.1 min, effective C/T 42.3 min.
Quality (RTY)
90.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€536,250
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
18.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Oxidized Leonardite O…
Lignite Ore & KOH Flakes
Weekly Vessel · LT 8d
PRODUCTION CONTROL / ERP
ChemERP
Seasonal Formula Push
CUSTOMER
Global Specialty Ag R…
28 tonnes/d
Takt: 32.1 min
EDI / Bulk Rail / Flatbed
MRP / Weekly Vessel
★ PACEMAKER
IN
Insert a step at the start
+
I
45
1.61 d
Drag to reorder step 1
WET PLANT
1. Hammer Crush & K…
×2
Continuous Flow
C/T
21.9 min
C/O
30 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
42 / 2d
OEE
90.8%
i
Insert a step here
+
I
50
1.79 d
Drag to reorder step 2
GRANULATION
2. Filter Press Ins…
×2
Push Flow
C/T
27.3 min
C/O
45 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
42 / 2d
OEE
84.7%
i
Insert a step here
+
I
56
2.00 d
TPM
Self-Clea…
Drag to reorder step 3
SCREEN TOWER
3. Drum Flaker Thin…
×2
BOTTLENECK
C/T
34.1 min
C/O
35 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
28 / 2d
OEE
77.3%
i
Insert a step here
+
I
28
1.00 d
Drag to reorder step 4
AGRO LAB
4. Fulvic Acid UV A…
×2
FIFO Lane
C/T
23.2 min
C/O
10 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
11 / 1d
OEE
90.9%
i
FIFO
Insert a step here
+
I
34
1.21 d
Drag to reorder step 5
BAGGING DOCK
5. 25kg Kraft Valve…
×2
FIFO Lane
C/T
18.7 min
C/O
15 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
14 / 1d
OEE
92.2%
i
Insert a step at the end
+
I
62
2.21 d
Finished Goods
OUT
1.61 d
VA 21.9 min
1.79 d
VA 27.3 min
2.00 d
VA 34.1 min
1.00 d
VA 23.2 min
1.21 d
VA 18.7 min
2.21 d
Total Lead Time
9.96 d
VA Time
2.1 h
PCE
1.39%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step