Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.4 s
Lead Time (LT)
9.80 d
Value-Added
13 s
Efficiency (PCE)
0.00%
Bottleneck1um Cartridge Polish Filter
11,601 < 16,000/day
Limit: downtime
Quality (RTY)
90.2%
WIP Capital
€329,280
Carbon CO₂
10,771.2 t CO₂e/year