Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Triple-Glazed Argon-Filled Warm-Edge IGU Unit
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
34 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Argon Gas-Press Dual Assemble
1,132 < 1,600/day
Limit: downtime
Argon Gas-Press Dual Assemble: capacity 1,132/day vs demand 1,600/day. Main limit: downtime. Raw C/T 36 s, effective C/T 45 s.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,136,640
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,611.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Warm-Edge Spacer Coils
Low-E Tempered Panes & …
Daily Silo/Sand · LT 4d
PRODUCTION CONTROL / ERP
GlazeERP
Continuous Furnace Campaign
CUSTOMER
Window & Door Assembl…
1,600 units/d
Takt: 34 s
EDI / Flatbed Stillage
MRP / Daily Silo/Sand
★ PACEMAKER
IN
Insert a step at the start
+
I
2,560
1.60 d
Drag to reorder step 1
BATCH TOWER
1. Auto Jumbo Cut &…
×1
Continuous Flow
C/T
23 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
2400 / 2d
OEE
93.7%
i
Insert a step here
+
I
2,240
1.40 d
Drag to reorder step 2
HOT END
2. TPS Thermoplasti…
×2
Continuous Flow
C/T
29 s
C/O
40 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
2400 / 3d
OEE
90.0%
i
Insert a step here
+
I
3,520
2.20 d
GREEN
Laser Fla…
Drag to reorder step 3
THERMAL LINE
3. Argon Gas-Press …
×3
BOTTLENECK
C/T
36 s
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
1600 / 2d
OEE
75.7%
i
Insert a step here
+
I
2,080
1.30 d
Drag to reorder step 4
COLD END
4. 2-Part Silicone …
×2
FIFO Lane
C/T
26 s
C/O
20 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
960 / 1d
OEE
86.6%
i
FIFO
Insert a step here
+
I
1,760
1.10 d
Drag to reorder step 5
STILLAGE DOCK
5. Gas Chromatograp…
×2
FIFO Lane
C/T
20 s
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
800 / 1d
OEE
94.1%
i
Insert a step at the end
+
I
3,200
2.00 d
Finished Goods
OUT
1.60 d
VA 23 s
1.40 d
VA 29 s
2.20 d
VA 36 s
1.30 d
VA 26 s
1.10 d
VA 20 s
2.00 d
Total Lead Time
9.60 d
VA Time
2.2 min
PCE
0.03%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step