Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Pelletized Dolomitic Agricultural Soil Lime
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.82 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.17%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Disc Pelletizer Ball Growth
175 < 240/day
Limit: downtime
Disc Pelletizer Ball Growth: capacity 175/day vs demand 240/day. Main limit: downtime. Raw C/T 4.0 min, effective C/T 4.9 min.
Quality (RTY)
90.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€270,480
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
161.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Dolomite Limestone Qu…
Fine Ground CaMg(CO3)2
Weekly Vessel · LT 8d
PRODUCTION CONTROL / ERP
QuarryERP
Seasonal Formula Push
CUSTOMER
Acidic Arable Farms
240 tonnes/d
Takt: 3.8 min
EDI / Bulk Rail / Flatbed
MRP / Weekly Vessel
★ PACEMAKER
IN
Insert a step at the start
+
I
384
1.60 d
Drag to reorder step 1
WET PLANT
1. Fine Raymond Mil…
×2
Continuous Flow
C/T
2.6 min
C/O
30 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
360 / 2d
OEE
90.8%
i
Insert a step here
+
I
432
1.80 d
Drag to reorder step 2
GRANULATION
2. Lignosulfonate B…
×2
Push Flow
C/T
3.2 min
C/O
45 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
360 / 2d
OEE
84.7%
i
Insert a step here
+
I
480
2.00 d
TPM
Self-Clea…
Drag to reorder step 3
SCREEN TOWER
3. Disc Pelletizer …
×2
BOTTLENECK
C/T
4.0 min
C/O
35 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
240 / 2d
OEE
77.3%
i
Insert a step here
+
I
240
1.00 d
Drag to reorder step 4
AGRO LAB
4. Rotary Belt Dry …
×2
FIFO Lane
C/T
2.7 min
C/O
10 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
96 / 1d
OEE
91.0%
i
FIFO
Insert a step here
+
I
288
1.20 d
Drag to reorder step 5
BAGGING DOCK
5. 500kg FIBC Tote …
×2
FIFO Lane
C/T
2.2 min
C/O
15 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
120 / 1d
OEE
92.2%
i
Insert a step at the end
+
I
528
2.20 d
Finished Goods
OUT
1.60 d
VA 2.6 min
1.80 d
VA 3.2 min
2.00 d
VA 4.0 min
1.00 d
VA 2.7 min
1.20 d
VA 2.2 min
2.20 d
Total Lead Time
9.82 d
VA Time
14.6 min
PCE
0.17%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step